Simple Steps To Help You Get The Best Results
-
To apply Crystal Serum Light (CSL) make sure your vehicle is indoors and can stay indoors for 12 hours after application, do not apply in direct sunlight
-
Only apply the product at a temperature between 5°c and 25°c
-
Shake well and wear gloves
-
Wash and decontaminate your paintwork thoroughly prior to application. If required, polish your paintwork, either by machine or hand, to remove any imperfections
-
Spray Panel Wipe into a Gtechniq MF1 Microfibre Cloth and wipe down each panel in small sections
-
Soak the application pad with 3 full measures of CSL from the pipette and work the liquid into the pad to get an even saturation
-
Replace the lid on the bottle and set it aside – do not keep the bottle in your hand as this promotes premature curing
-
Apply in overlapping strokes to an area roughly 2ft by 2ft (60cm x 60cm)
-
Immediately remove residue with an MF1 cloth – you may need to buff the same area several times, but avoid doing it with too much force. We recommend the use of 2 cloths at any one time. Make sure the cloths are rotated during residue removal to prevent CSL curing in the cloth
-
Inspect the surface for residue with a bright, diffused light source
-
If you have removed the residue and it cures fully, you should polish the area and reapply CSL
-
As soon as you finish, put your MF1 cloths in water, wash and dry them as soon as possible
-
Wait a minimum of 1 hour after applying CSL before applying EXO Ultra Durable Hydrophobic Coating, or C2 Liquid Crystal
-
Store in a cool, dry place
-
If opened, use within 3 months, if unopened, use within 12 months
-
* Avoid direct application to plastic trims, rubbers and hard plastics. *
- To apply Crystal Serum Light (CSL) make sure your vehicle is indoors and can stay indoors for 12 hours after application, do not apply in direct sunlight
- Only apply the product at a temperature between 5°c and 25°c
- Shake well and wear gloves
- Wash and decontaminate your paintwork thoroughly prior to application. If required, polish your paintwork, either by machine or hand, to remove any imperfections
- Spray Panel Wipe into a Gtechniq MF1 Microfibre Cloth and wipe down each panel in small sections
- Soak the application pad with 3 full measures of CSL from the pipette and work the liquid into the pad to get an even saturation
- Replace the lid on the bottle and set it aside – do not keep the bottle in your hand as this promotes premature curing
- Apply in overlapping strokes to an area roughly 2ft by 2ft (60cm x 60cm)
- Immediately remove residue with an MF1 cloth – you may need to buff the same area several times, but avoid doing it with too much force. We recommend the use of 2 cloths at any one time. Make sure the cloths are rotated during residue removal to prevent CSL curing in the cloth
- Inspect the surface for residue with a bright, diffused light source
- If you have removed the residue and it cures fully, you should polish the area and reapply CSL
- As soon as you finish, put your MF1 cloths in water, wash and dry them as soon as possible
- Wait a minimum of 1 hour after applying CSL before applying EXO Ultra Durable Hydrophobic Coating, or C2 Liquid Crystal
- Store in a cool, dry place
- If opened, use within 3 months, if unopened, use within 12 months
- * Avoid direct application to plastic trims, rubbers and hard plastics. *